7:10 and they're still out there working. I have a feeling they will be staying late the remainder of this week and next to finish this up.
Founder of http://www.sfgamnation.com Favorite Steel: 1. Maverick 2. The Incredible Hulk 3. Millennium Force Favorite Wood: 1. Outlaw Run 2. The Beast 3. American Eagle
^ Over the past two days after 5pm, there appears to only be anti rollback and chain return going in. During that time (and I've seen it in person too), there's appeared to be only one person working at the lift hill and nobody else in sight. So unless RMC cuts back dramatically on their crews and has the ones still working work in areas allowing them not to be seen after 5, this guy must be the only one working after that time (besides perhaps a crane operator).
Consecutive Trips Riding X Flight: 92 SFGAm Lifetime Trips: 104
I think it was around 7:15 or 7:30 last night, I saw about 3 guys out there working but yes, they were working on the chain return track.
Founder of http://www.sfgamnation.com Favorite Steel: 1. Maverick 2. The Incredible Hulk 3. Millennium Force Favorite Wood: 1. Outlaw Run 2. The Beast 3. American Eagle
Founder of http://www.sfgamnation.com Favorite Steel: 1. Maverick 2. The Incredible Hulk 3. Millennium Force Favorite Wood: 1. Outlaw Run 2. The Beast 3. American Eagle
Hmm... well, they just took the piece back down to the ground.
Founder of http://www.sfgamnation.com Favorite Steel: 1. Maverick 2. The Incredible Hulk 3. Millennium Force Favorite Wood: 1. Outlaw Run 2. The Beast 3. American Eagle
(sorry for the old reference for those that don't get it)
I know there's at least one car on the track already from a couple weeks ago, but have they added more since then?
Founder of http://www.sfgamnation.com Favorite Steel: 1. Maverick 2. The Incredible Hulk 3. Millennium Force Favorite Wood: 1. Outlaw Run 2. The Beast 3. American Eagle
Beavis97 wrote:They can have that installed on the track already and just mount it to the structure
Sent from my iPhone using Tapatalk
Doesn't work like that. The supports need to be there before the track is put up. They can't assemble something that wide on the ground and lift it. That's basic laws of physics. Have you ever watched a coaster being built? They never lift track with supports mounted to it.
"I've been told that some part of every wish will be heard but lately I lost sight of the truth in those words."
They can finish the ride by Friday! I can just feel it. They only have to finish the lift, the zero g roll and fill the drop with grout, and get the train(s) on the track and start testing.