SFGAmWorld.com
Untitled Document
Park Information
Latest News
Great America
Roller Coasters
Rides
Hurricane Harbor
Water Slides
Water Attractions
Advertisement

Official Goliath Thread

Talk about anything that has to do with Six Flags Great America and Hurricane Harbor here.
Postby Guy_With_A_Stick on May 5th, 2014, 6:56 pm
I just love how we can go into other topics of conversation, and still be on topic! We were talking about the trains arriving, then it's colors, then the weather, now time with manufacturers! Oh, life. :D
Image

Join the SFGAm Fan Discord! https://discord.gg/bNrTj9P

The Voyage | Goliath SFGAm | Skyrush | Maverick | Viper SFGAm | Outlaw Run | Thunderhead | TTD | Lightning Run | Thunderbird
Guy_With_A_Stick

User avatar
 
Posts: 1958
Joined: February 20th, 2014, 5:37 pm
Location: Six Flags Great America

Postby JimPanky on May 5th, 2014, 7:47 pm
most of that is goliath related though

Sent from my XT897 using Tapatalk
JimPanky

User avatar
 
Posts: 1013
Joined: March 12th, 2013, 7:55 pm
Location: Posen, IL

Postby BBH on May 5th, 2014, 9:35 pm
I'm surprised to see seatbelts after we'd been told after the NTG incident that there wouldn't be any, but meh, they don't affect Viper's airtime in any way so I'm fine with it.

Side note, those trains are DAMN sexy. Honestly, those are some of the best looking trains I've ever seen, certainly from Six Flags. Up there with, get this, Outlaw Run's as some of the most beautiful.
"Remove this man before I commit an act of violence against him."
-Ron Swanson
BBH

User avatar
 
Posts: 235
Joined: January 1st, 2013, 12:14 am

Postby Chitown on May 5th, 2014, 9:41 pm
I finally retired the Sarah Palin signature because she is now 100% irrelevant.
Chitown

User avatar
 
Posts: 2563
Joined: December 31st, 2002, 12:27 am
Location: Gotham City

Postby Iron Wolf 90-11 on May 6th, 2014, 11:36 am
Image
Iron Wolf 90-11

User avatar
 
Posts: 856
Joined: November 16th, 2011, 6:22 pm
Location: Iron Wolf

Postby BackwardsBlue on May 6th, 2014, 12:37 pm
I am really wondering how they are going to put up the rest of the hill... One big piece, small pieces or are they going to build up the hill from the support then go downwards towards the existing track... They are really rocking this build even with the winter a week late is not bad at all.
BackwardsBlue

User avatar
 
Posts: 122
Joined: August 13th, 2013, 10:36 am
Location: Gurnee, Il

Postby CoasterMike on May 6th, 2014, 1:03 pm
I'm not saying this will happen however, I would not be surprised to see Goliath get pushed back another week (June 6th & 7th). What do you guys think?
CoasterMike

User avatar
 
Posts: 438
Joined: August 16th, 2013, 8:54 am

Postby BackwardsBlue on May 6th, 2014, 1:19 pm
I dk I feel like they would say something already if they thought they were pushing it back more... I mean RMC is now working 6 days a week to get this done and six flags has media say lined up so I'm hoping for on time however a push back is still very possibly


Sent from my iPhone using Tapatalk
BackwardsBlue

User avatar
 
Posts: 122
Joined: August 13th, 2013, 10:36 am
Location: Gurnee, Il

Postby tp41190 on May 6th, 2014, 1:27 pm
Does anyone have any information on typical testing? I know it's an X amount of cycles, but I wonder how soon they could get that done if they ran it 24/7. This ride is also a basic full circuit coaster. I doubt they would really run into anything weird that would cause a delay.

They could have all of the main mechanical and electronic components already done. Chain lift motor is usually on the bottom of the lift, and they could be working on all of the brakes and station components at the same time.
[read]
tp41190

User avatar
 
Posts: 1523
Joined: April 29th, 2007, 11:57 am
Location: Denver, CO

Postby BackwardsBlue on May 6th, 2014, 1:30 pm
Yeah because they are not building up today I would not be shocked if they are working on electrical pieces of it. I have heard/read that a wooden roller coaster needs a full week of testing.


Sent from my iPhone using Tapatalk
BackwardsBlue

User avatar
 
Posts: 122
Joined: August 13th, 2013, 10:36 am
Location: Gurnee, Il

Postby CoasterMike on May 6th, 2014, 1:33 pm
tp41190 wrote:Does anyone have any information on typical testing? I know it's an X amount of cycles, but I wonder how soon they could get that done if they ran it 24/7. This ride is also a basic full circuit coaster. I doubt they would really run into anything weird that would cause a delay.

They could have all of the main mechanical and electronic components already done. Chain lift motor is usually on the bottom of the lift, and they could be working on all of the brakes and station components at the same time.



An average coaster needs 2-3 weeks of testing from my knowledge. If they finish the entire ride and start testing the ride by the middle or the end of next week, then it would more then likely open up on time.
CoasterMike

User avatar
 
Posts: 438
Joined: August 16th, 2013, 8:54 am

Postby GoBears on May 6th, 2014, 1:43 pm
New piece...

Image
Founder of http://www.sfgamnation.com
Favorite Steel: 1. Maverick 2. The Incredible Hulk 3. Millennium Force
Favorite Wood: 1. Outlaw Run 2. The Beast 3. American Eagle
GoBears

User avatar
 
Posts: 325
Joined: August 8th, 2013, 12:56 pm
Location: Machesney Park, IL

Postby w00dland on May 6th, 2014, 2:25 pm
At this point I believe that the opening schedule is likely set in stone, but that doesn't mean a pushback isn't possible. Six Flags needs to set a date for Media day since this coaster is going to receive national attention as its breaking plenty of records in a big year for the industry, but things don't always go to plan. There certainly is a lot of work to be completed after the physical structure of the coaster. Electrics and ride control systems have already been mentioned, but don't forget about theming (ha) station work, landscaping etc. I think we might have a pretty barebones coaster for opening weekend, but it'll get better as summer goes on and more is added.

That being said, SFMM had a solid date for their media day on Lex Luthor, and that was delayed right before the date, so who knows.
Top 5 wood-5-Goliath 4-Ravine Flyer II 3-Phoenix 2-Voyage 1-El Toro
Top 5 Steel- 5-Velocicoaster 4- Maverick 3- Fury 325 2-Steel Vengeance 1-X2
Coaster Count: 444
w00dland
Moderator

User avatar
 
Posts: 4630
Joined: January 29th, 2004, 2:36 pm
Location: Winter Haven, FL

Postby BackwardsBlue on May 6th, 2014, 2:38 pm
They already have a media day set it's the 29th


Sent from my iPhone using Tapatalk
BackwardsBlue

User avatar
 
Posts: 122
Joined: August 13th, 2013, 10:36 am
Location: Gurnee, Il

Postby steve0145 on May 6th, 2014, 3:12 pm
There filling the track with cement right now.
Take a look at my YouTube channel all about Six flags Shows and actors https://www.youtube.com/steve0145
steve0145

 
Posts: 84
Joined: February 19th, 2008, 9:50 am
Location: Milwaukee WI

Postby JimPanky on May 6th, 2014, 3:26 pm
Media day is May 29th invites have already been sent out.

Sent from my XT897 using Tapatalk
JimPanky

User avatar
 
Posts: 1013
Joined: March 12th, 2013, 7:55 pm
Location: Posen, IL

Postby Viper 88 on May 6th, 2014, 3:41 pm
I'm just curious to how some of you know that a coaster needs 2-3 weeks of testing?
Viper 88

User avatar
 
Posts: 636
Images: 0
Joined: July 10th, 2008, 2:24 pm

Postby Iron Wolf 90-11 on May 6th, 2014, 6:24 pm
From the parks Twitter
Image
Iron Wolf 90-11

User avatar
 
Posts: 856
Joined: November 16th, 2011, 6:22 pm
Location: Iron Wolf

Postby w00dland on May 6th, 2014, 10:26 pm
I think you all mis-understood me earlier. I'm aware the park has set its media day date, what I had meant was that they [i]needed[i] to fairly far in advance due to how large the event was set to be. I'm sure I'll likely see many of you there.

Still doesn't mean they can't delay it if things go poorly in the next 3 weeks.
Top 5 wood-5-Goliath 4-Ravine Flyer II 3-Phoenix 2-Voyage 1-El Toro
Top 5 Steel- 5-Velocicoaster 4- Maverick 3- Fury 325 2-Steel Vengeance 1-X2
Coaster Count: 444
w00dland
Moderator

User avatar
 
Posts: 4630
Joined: January 29th, 2004, 2:36 pm
Location: Winter Haven, FL

Postby CoastsToCoasters on May 7th, 2014, 2:21 am
Yes, I know what you meant & I will see you there W00dland ;) I hope they top off by Friday when I visit the park, anyone else going that day?!

Just to let everyone know, if you're goin to post photos of Goliath or comment on someone elses photo on instagram, be careful apparently. I tried to have a simple conversation with an instagram user over the construction pics we took & was quickly "gaybashed" by a "Ryan Paver" & his friend Matthew who no joke has pulled this s*it on two of my other friends for even liking one of their posts.

I understand this may be slightly off topic but this has happened to us the last couple days or so, just want to warn those who may like other users SFGAm photos to watch out for those users sadly.
CoastsToCoasters

User avatar
 
Posts: 2352
Joined: September 5th, 2005, 12:41 am
Location: Chicago, IL.

Postby CoasterMike on May 7th, 2014, 7:47 am
Iron Wolf 90-11 wrote:From the parks Twitter
Image



That looks beastly INSANE! Can't wait to ride it! Thanks for this photo Iron Wolf 90-11!
CoasterMike

User avatar
 
Posts: 438
Joined: August 16th, 2013, 8:54 am

Postby BackwardsBlue on May 7th, 2014, 8:16 am
I'm so excited I can't wait til media day!!!!


Sent from my iPhone using Tapatalk
BackwardsBlue

User avatar
 
Posts: 122
Joined: August 13th, 2013, 10:36 am
Location: Gurnee, Il

Postby TwistedSTEEL666 on May 7th, 2014, 8:34 am
I hope to see the bracing support for the zero G stall start to go up today.
On a side note, do you guys think they are going to finish the lift by lifting the remaining pieces into place one by one, or by building the last piece of the lift hill structure in the parking lot and lifting that whole thing into place?
Image
Antonio Aguilera
https://www.facebook.com/BEAMER3K
http://beamer3k.deviantart.com/
View my artwork.

Check out my YouTube Gamer channel.
NRG-FLO Gaming.
https://www.youtube.com/@NRGFLOGaming
TwistedSTEEL666

User avatar
 
Posts: 1152
Images: 72
Joined: March 24th, 2003, 12:04 am
Location: Darien- About an hour away or so.

Postby CoasterMike on May 7th, 2014, 8:43 am
TwistedSTEEL666 wrote:I hope to see the bracing support for the zero G stall start to go up today.
On a side note, do you guys think they are going to finish the lift by lifting the remaining pieces into place one by one, or by building the last piece of the lift hill structure in the parking lot and lifting that whole thing into place?


I'm not an expert at the construction of roller coasters however my guess is they would lift the last pice of the lift hill as a whole. That would be quicker.
CoasterMike

User avatar
 
Posts: 438
Joined: August 16th, 2013, 8:54 am

Postby TwistedSTEEL666 on May 7th, 2014, 8:46 am
CoasterMike wrote:
TwistedSTEEL666 wrote:I hope to see the bracing support for the zero G stall start to go up today.
On a side note, do you guys think they are going to finish the lift by lifting the remaining pieces into place one by one, or by building the last piece of the lift hill structure in the parking lot and lifting that whole thing into place?


I'm not an expert at the construction of roller coasters however my guess is they would lift the last pice of the lift hill as a whole. That would be quicker.


That would make sense. They had built the ride in large sections and lifted them into place through out the winter, so I wouldn't be surprised if they did a similar thing with the last piece of the lift hill. I can't wait to see it topped off! :)
Image
Antonio Aguilera
https://www.facebook.com/BEAMER3K
http://beamer3k.deviantart.com/
View my artwork.

Check out my YouTube Gamer channel.
NRG-FLO Gaming.
https://www.youtube.com/@NRGFLOGaming
TwistedSTEEL666

User avatar
 
Posts: 1152
Images: 72
Joined: March 24th, 2003, 12:04 am
Location: Darien- About an hour away or so.

PreviousNext

Return to Six Flags Great America Forum

Who is online

Users browsing this forum: Bing [Bot] and 37 guests

Privacy Policy About Us Copyright Disclaimer E-Mail SFGAmWorld
COPYRIGHT - SFGAmWorld.com
All content and images on this site are Copyright 2001 - SFGAmWorld.com and may not be used without permission.
This is NOT the official site of Six Flags Great America, SFGAmWorld.com is not affilated or endorsed by Six Flags Great America.
SFGAmWorld.com does not make any guarantee on the accuracy of the information on this website and cannot be held responsible by the use of this information.
SIX FLAGS and all related indicia are trademarks of Six Flags Theme Parks Inc. ®, TM and © . The official Six Flags site can be found at SixFlags.com
BATMAN, SUPERMAN and all related characters and elements are trademarks of © DC Comics.
LOONEY TUNES and all related characters and elements are trademarks of and © Warner Bros. Entertainment Inc.©
The Wiggles Pty Ltd. SCOOBY-DOO and all related characters and elements are trademarks of and © Hanna-Barbera.

cron