DeathbyDinn wrote:Anyone see where the cars got moved to?
They are on the same brake segment/run but just pulled a few yards back. With the crane being over by the brakes, I wonder if we will see more cars added today.
Top 3 Steel Coasters: 1. The Incredible Hulk 2. Maverick 3. Dragon Challenge (Fireball)
Top 3 Wood Coasters: 1. The Beast 2. American Eagle (Red) 3. Hades
^ They were doing partial testing. They pushed the cars back through the brakes around the curve, and to the back of the brake run, then let it go through forward to where it is now. The cranes are working on the storage track shed and station. Cranes are not used to add cars on most coasters as most coasters have a permanent hoist built in at the back of one of the storage tracks.
^That would make sense considering most cars are taken off the tracks on the majority of all coasters each year. I'm sure the roof of the station will go up rather quickly but aren't they adding a small tower to the side of the station in between the two stairs on the right side?
Top 3 Steel Coasters: 1. The Incredible Hulk 2. Maverick 3. Dragon Challenge (Fireball)
Top 3 Wood Coasters: 1. The Beast 2. American Eagle (Red) 3. Hades
^If you look at yesterday's Twitter photo, the opening to use the hoist on Storage 2 is currently blocked by beams. I assume the park's maintenance staff has decided not to wait for the construction crew to finish that.
5th car is on, the crane is set to lift the 6th car up anytime now. The first train should be done today, and I would start paying very close attention because testing could start as soon as Monday.
Does anyone know if they did the pull through/clearance test yet? I can't imagine they'll be letting trains run the course before doing that but I haven't seen or heard of the tests being done yet.
^ I have never seen a B&M do a full pull-through. All they do is push a wood, plastic, or metal reach envelope through the tight spots. And since the fly-through and hangar both haven't been completed, obviously that hasn't happened.