SFGAmWorld.com
Untitled Document
Park Information
Latest News
Great America
Roller Coasters
Rides
Hurricane Harbor
Water Slides
Water Attractions
Advertisement

X-Flight new for 2012

Talk about anything that has to do with Six Flags Great America and Hurricane Harbor here.
Postby RBullFan97 on December 29th, 2011, 12:44 pm
I wouldn't be surprised if vertical construction begins next week.
SFGAm Ride Count 2018: 286
SFGAm Ride Count 2019: 252
SFGAm Ride Count 2020: Well, ya know...
RBullFan97

User avatar
 
Posts: 264
Images: 10
Joined: May 5th, 2011, 9:07 pm
Location: 15 minutes from SFGAm

Postby Goku1910 on December 29th, 2011, 12:47 pm
me & a few others have already determined it will be next week if not the very beginning of the week after. That's just by looking at it's current progress/past experience.
"I've been told that some part of every wish will be heard but lately I lost sight of the truth in those words."
Goku1910

User avatar
 
Posts: 2719
Joined: March 5th, 2008, 3:13 pm

Postby Goku1910 on December 29th, 2011, 12:49 pm
new page:

Image
"I've been told that some part of every wish will be heard but lately I lost sight of the truth in those words."
Goku1910

User avatar
 
Posts: 2719
Joined: March 5th, 2008, 3:13 pm

Postby m29df42z on December 29th, 2011, 4:34 pm
It looks great down there!! I can not wait for vertical construction to start!! It's going to feel so good seeing another coaster being built in this park. Vertical construction/ testing & pull throughs are my favorite part of the construction process and gets me really excited!! AHHHHH! Can't wait!!
m29df42z

 
Posts: 19
Joined: May 30th, 2007, 11:23 am

Postby CstrFan512 on December 29th, 2011, 5:22 pm
Goku1910 wrote:
Nope, it's just a "super footer", there will be multiple supports on it. A Super Footer, for example on Bull's turn around next to Viper. That's all one big footer in the center.


Based on this picture, http://rcdb.com/10137.htm?p=36920 which is accurate if your looking from AE, I don't see where a super footer would go there. It looks to be in the right area for the control tower. Interesting, if it is, that Six Flags would put that up now.
Don't fight the Bull, ride the Bull!

Best 2011 Moment: "I lost my phone on Raging Bull!"
"WELL I LOST A SOCK!!!"
Best 2012 Moment: "No good! DREAM ON!"
Best 2013 Moment: "I came here for Auntie Anne's pretzels and coasters......in that order!"
CstrFan512

User avatar
 
Posts: 306
Joined: April 22nd, 2011, 2:36 pm
Location: Plainfield, IL

Postby mrsix on December 29th, 2011, 5:58 pm
off of that subject it looks like you enter and exit the same side but how do u get onto the other side
mrsix

 
Posts: 39
Joined: December 19th, 2011, 10:42 am

Postby DeathbyDinn on December 29th, 2011, 7:56 pm
Looking at the ride animation, there's stairs leading up to the other side, you just can't see them in the concept art.
DeathbyDinn

User avatar
 
Posts: 806
Joined: April 21st, 2010, 5:08 pm
Location: Milwaukee, WI

Postby Goku1910 on December 29th, 2011, 9:03 pm
CstrFan512 wrote:
Goku1910 wrote:
Nope, it's just a "super footer", there will be multiple supports on it. A Super Footer, for example on Bull's turn around next to Viper. That's all one big footer in the center.


Based on this picture, http://rcdb.com/10137.htm?p=36920 which is accurate if your looking from AE, I don't see where a super footer would go there. It looks to be in the right area for the control tower. Interesting, if it is, that Six Flags would put that up now.


That's just a rendering to get the GENERAL idea of what the ride will look like. The real footers are circles....they don't look like that in the rendering. The render shows tiny squares. Trust me when I say the super footer is for the multiple supports. It's wider than it is in length anyway....and according to the rendering, the control tower is SQUARE.
"I've been told that some part of every wish will be heard but lately I lost sight of the truth in those words."
Goku1910

User avatar
 
Posts: 2719
Joined: March 5th, 2008, 3:13 pm

Postby BP317 on December 29th, 2011, 9:18 pm
mrsix wrote:off of that subject it looks like you enter and exit the same side but how do u get onto the other side

http://www.youtube.com/watch?v=7BlkeSgBcQQ
They have to wait for everyone to get off of the loading platform before opening the gates for the next train. The queue splits into two when you are about to go up to the station, which hopefully is patrolled for only a few trains worth of people can go up for each side because i've had the pleasure of waiting for X2 after the split even with the line only halfway down the ramp and it probably took an hour from there even with 2 train op.
BP317
Webmaster/Site Admin

User avatar
 
Posts: 2135
Joined: September 2nd, 2006, 12:09 am

Postby 6Flags4Evr on December 29th, 2011, 11:55 pm
Correct me if im wrong but once all the footers have been dug and been put into place, isn't there suppose to be some sort of cure period that takes like two weeks in order for all the footers to settle into place or something like that?
Can't live without Coasters!!!
6Flags4Evr

User avatar
 
Posts: 229
Joined: July 24th, 2010, 6:34 pm

Postby chester016 on December 30th, 2011, 12:14 am
^^ I think you may be right. However, since some of those footers were built over a month ago already, they will most likely start installing track on them first.
chester016

 
Posts: 97
Joined: June 26th, 2011, 2:17 am

Postby FParker185 on December 30th, 2011, 5:05 am
For B&M's the very first thing always to go up is the storage tracks, transfer track, final brakes and station track.
Favorite Wood Coasters: The Voyage, Ravine Flyer II, Thunderhead, Balder
Favorite Steel: Voltron Nevera, Steel Vengeance, Expedition GeForce, Olympia Looping
Parks visited: 232, Coasters Ridden: Steel: 894, Wood: 179, Total: 1073
FParker185

User avatar
 
Posts: 4508
Joined: February 5th, 2004, 12:04 am
Location: Joliet, IL

Postby clevelands on December 30th, 2011, 11:07 am
I know everyone's been happy since the winter has been mild, but if it wasn't and there was snow, how would it change the construction? can they still work in the snow?
first GP rider of the season: Batman the Ride (2011)
first GP rider of the season: Iron Wolf (2011) (almost a solo ride)
last GP train of iron wolf's existence at GAM (front row)
last GP person off Wolf's station
/brag
clevelands

User avatar
 
Posts: 15
Joined: September 6th, 2011, 3:07 pm

Postby FParker185 on December 30th, 2011, 11:10 am
Once vertical construction starts, the only thing that can shut down the site is high wind.
Favorite Wood Coasters: The Voyage, Ravine Flyer II, Thunderhead, Balder
Favorite Steel: Voltron Nevera, Steel Vengeance, Expedition GeForce, Olympia Looping
Parks visited: 232, Coasters Ridden: Steel: 894, Wood: 179, Total: 1073
FParker185

User avatar
 
Posts: 4508
Joined: February 5th, 2004, 12:04 am
Location: Joliet, IL

Postby Johnny.Ink on December 30th, 2011, 1:13 pm
Because Iron workers are crazy, and barely anything stops them. I mean, I'm sure a blizzard or something that hampers their visability, but ...

I realize that every ride is different, but how long does a typical steel roller coaster take to build?

Does RCDB track info like that?
Johnny.Ink

User avatar
 
Posts: 393
Joined: August 30th, 2011, 3:27 pm
Location: Naperville, IL

Postby FParker185 on December 30th, 2011, 2:01 pm
It depends how much track there is, what kind of weather is happening, the terrain that the ride is occupying and deadlines. I'd say if everyone really needed it, X flight could go up in 2 weeks or less with large crews and multiple cranes, of course there is no looming deadline and cost is always a priority so if I were to take a wild guess, X flight construction once it goes vertical will probably something like 6-8 weeks, Now if SFGAm was in charge of the construction I'd have to raise the estimate to 6-8 months :)

Ragin Cajun should have gone from concrete slab to operating coaster in 3-5 days rather than the 2 or so months that it took, though there were other (questionable) factors involved. Though being new from the factory up to 2 weeks would probably have been reasonable.

I don't think RCDB tracks that sort of thing, but if I remember right, Superman went vertical in like Feb and was completed around late March. Raging Bull went vertical in Jan and was completed in Mid March. Deja Vu didn't go vertical til March or even early april and I want to say it was completed around June, though they worked around the park's operating schedule for a while, and construction was delayed due to quickly apparent issues with SFOG's Deja Vu.

Mr Freeze at SFOT went Vertical in Mid March 1997 and was completed on May 8, 1997.

So I guess between 2 and 3 months is pretty standard for most steel coasters, from the first steel going up til the ride is structurally complete (not including any of the mechanical, electrical, pneumatic stuff, etc)
Favorite Wood Coasters: The Voyage, Ravine Flyer II, Thunderhead, Balder
Favorite Steel: Voltron Nevera, Steel Vengeance, Expedition GeForce, Olympia Looping
Parks visited: 232, Coasters Ridden: Steel: 894, Wood: 179, Total: 1073
FParker185

User avatar
 
Posts: 4508
Joined: February 5th, 2004, 12:04 am
Location: Joliet, IL

Postby Sporlo on December 30th, 2011, 5:40 pm
What are they doing by creating a huge trench/hole/pool in the middle-right part of the camera? I compiled December 29 and 30 images into one so you can take a look.
(to see it full size, open the image in a new tab/window)
Image
Sporlo

 
Posts: 430
Joined: August 27th, 2011, 11:29 am

Postby Goku1910 on December 30th, 2011, 7:47 pm
^We'll find out Monday I guess. It's a hole in the middle of three fairly large footers......
"I've been told that some part of every wish will be heard but lately I lost sight of the truth in those words."
Goku1910

User avatar
 
Posts: 2719
Joined: March 5th, 2008, 3:13 pm

Postby 6Flags4Evr on December 30th, 2011, 7:53 pm
My best guess would be that it's the foundation for that watch tower thing.
Can't live without Coasters!!!
6Flags4Evr

User avatar
 
Posts: 229
Joined: July 24th, 2010, 6:34 pm

Postby BP317 on December 30th, 2011, 8:16 pm
Reminds me of that time they built the SUF support in the middle of the parking lot way the hell away from the ride. Even thought the ride was going to be huge then it turned out to be nothing. Anyone remember that...or know what that was all about? :lol:
BP317
Webmaster/Site Admin

User avatar
 
Posts: 2135
Joined: September 2nd, 2006, 12:09 am

Postby FParker185 on December 30th, 2011, 8:31 pm
I remember that. I guess they actually assembled most of the supports out in the parking lot before taking them onto the site proper. Just most of them were the normal 2 pole supports and they laid flat. That 3 legged deal had to stand up, if I remember right it was right near the enterance road as it cuts though the lot, if not in the overflow lot. It was way out there.

Also the trench looks to be for drainage pipes/infrastructure.
Favorite Wood Coasters: The Voyage, Ravine Flyer II, Thunderhead, Balder
Favorite Steel: Voltron Nevera, Steel Vengeance, Expedition GeForce, Olympia Looping
Parks visited: 232, Coasters Ridden: Steel: 894, Wood: 179, Total: 1073
FParker185

User avatar
 
Posts: 4508
Joined: February 5th, 2004, 12:04 am
Location: Joliet, IL

Postby SammyTheSparerib on December 30th, 2011, 9:53 pm
Six Flags Great America hosts the annual PhysiX Day private event on Tuesday, May 15. Be one of the first people to ride the all-new X-Flight. X-Flight will be open exclusively for PhysiX Day guests before it opens to the general public. The PRIVATE PhysiX Day is open to physics teachers and students only.

:(
SammyTheSparerib

 
Posts: 41
Joined: August 16th, 2004, 10:23 pm

Postby DejaVu2001 on December 30th, 2011, 9:59 pm
^ I was really hoping for opening day.
Last edited by DejaVu2001 on January 19th, 2012, 7:04 pm, edited 1 time in total.
DejaVu2001

 
Posts: 2171
Images: 42
Joined: December 22nd, 2006, 12:43 am

Postby tribar on December 31st, 2011, 12:10 am
Serious BS right there


I couldn't have said it better myself.

I would like Option 2 but i'll take 1 before 3
tribar

User avatar
 
Posts: 1078
Joined: August 6th, 2010, 3:29 pm

Postby Cole on December 31st, 2011, 12:27 am
Fanboys attack!
Top 5: 1) El Toro. 2) Maverick. 3) Millenium Force. 4) Diamondback. 5) X2.
Coaster Count: 167 (41 Wood, 125 Steel)
@Coaster_Cole on Twitter
Cole

 
Posts: 1224
Joined: January 7th, 2010, 4:00 pm
Location: Milwaukee

PreviousNext

Return to Six Flags Great America Forum

Who is online

Users browsing this forum: Google [Bot] and 14 guests

Privacy Policy About Us Copyright Disclaimer E-Mail SFGAmWorld
COPYRIGHT - SFGAmWorld.com
All content and images on this site are Copyright 2001 - SFGAmWorld.com and may not be used without permission.
This is NOT the official site of Six Flags Great America, SFGAmWorld.com is not affilated or endorsed by Six Flags Great America.
SFGAmWorld.com does not make any guarantee on the accuracy of the information on this website and cannot be held responsible by the use of this information.
SIX FLAGS and all related indicia are trademarks of Six Flags Theme Parks Inc. ®, TM and © . The official Six Flags site can be found at SixFlags.com
BATMAN, SUPERMAN and all related characters and elements are trademarks of © DC Comics.
LOONEY TUNES and all related characters and elements are trademarks of and © Warner Bros. Entertainment Inc.©
The Wiggles Pty Ltd. SCOOBY-DOO and all related characters and elements are trademarks of and © Hanna-Barbera.