Though construction has been delayed by the weather, Six Flags Great America officials say the "Dark Knight" roller coaster is still on track to open in April.
I'm calling their bluff. There is absolutely no way they are getting this ride open April 26th. SFNE has their entire building framed and we have dirt. There is no way ours is opening earlier than SFNE's when they are that far ahead of us in construction.
^I agree. That video was nice, as it's the first one I've seen for the new coaster. It looks like it's going to be a lot more of a darker (not lighting wise) ride than I thought.
Well, lets just say I knew there was photos but I didn't know there was a vidoe there until today. Looks like we got switched. You found the video and I found the pics first.
Top 3 Steel Coasters: 1. The Incredible Hulk 2. Maverick 3. Dragon Challenge (Fireball)
Top 3 Wood Coasters: 1. The Beast 2. American Eagle (Red) 3. Hades
Any knowledge on the Flash Pass not being used? Is there an anticipated Wait Time for TDK?
A friend is upset about the flashpass not being able to be used and wanted to know if there is an anticipated wait time for the ride. 2 hours? 4? 8?
it's capacity will be better than Rajun Cajun which is a similar ride, so the line for BDK will be shorter than that you can assume as a general guide.
Favorite Wood Coasters: The Voyage, Ravine Flyer II, Thunderhead, Balder Favorite Steel: Steel Vengeance, Expedition GeForce, Olympia Looping Parks visited: 222, Coasters Ridden: Steel: 822, Wood: 178, Total: 1000
Now, things can change once the ride actually openes. But, if you go by the drawing, it is clearly marked as Fast Pass on the right side of the picture.
Im pretty sure the article says the attraction is planned to open with the park. And that's why im confused about this because its not like its the gurnee paper its the daily herald.
^^ Look at the date of the article. Things have changed since this article was published. As stated on SFGAm's official website, and in today's Gurnee Review, The Dark Knight Coaster will open on May 21st.