A new constrution update on Six Flags.com says Hurricane Harbor construction is right on schedule. There were also 2 pictures from December 18th added of the concrete for the wave pool floor being poured. There was also an update on the time lapse cam from December 5 to January 5.
Read More at: <a href="http://www.sixflags.com/parks/hurricaneharborchicago/index.html" class="news" target="blank">Six Flags.com</a>