Tower of terror in Australia (which uses a similar launch system to that of V2) uses 2.2 mega Watts (1,000,000 Watts) of power per launch according to Wikipedia...
I also assumed that the ride launches every 4 minutes each time for approximately 9 seconds.
I think they should take the parking lot and put solar panels over the hole lot it would off set the coast to run the park and shade our cars at the same time and more money to put in to other things in the park
Agreed that V2 costs more than $137 a day to run, but it would be quite a bit less than S:TE. Technology has come a long way since 1995
The most power consuming part of the ride is/was most likely the stop on the back tower.
Flat rides eat up a lot of power also.
Huss Top Spin needs 240kW Huss Frisbee 290 kW Orbit is a quite small 120kW Fiddlers Fling is 140 kW East River Crawler is also 140 kW Sky Trek is around 120kW
So right there, 6 flats and you're well over 1 megawatt of electricity. Which is good, cause it proves a point and it's not quite easy to drag up manufacturer's info for in some cases 30+ year old rides
Favorite Wood Coasters: The Voyage, Ravine Flyer II, Thunderhead, Balder Favorite Steel: Voltron Nevera, Steel Vengeance, Expedition GeForce, Olympia Looping Parks visited: 232, Coasters Ridden: Steel: 894, Wood: 179, Total: 1073
The park emailed me a short message basically saying V2 will have the break fixed this season not necessarily right when the 09 season gets started. Probably later in the season.
SFGAm07 wrote:V2 costs a lot more than $137 a day for power, Superman at SFMM costs almost that much every time it launches.
Its because I made some assumptions that would get me close and I didnt include the back spike which as previously stated would suck a ton of power.
onyxhotel08 wrote:The park emailed me a short message basically saying V2 will have the break fixed this season not necessarily right when the 09 season gets started. Probably later in the season.
I assume then sometime during operation it will be down which is unfortunate. If they use a crane to fix it which the would have to, the would probably need to close off clipper as well...
Remember, there's nothing but air beneath the chair.
Which is why I'm sure sometimes the big guys wish V2 was no more. If V2 was being considered for 2009 not 2001 it would NEVER come to be. 8 years a big difference in the times and budgets. You will also never see two giants like Deja Vu and V2 in the same season. Not in the next 4-8 years at least.
Demon_07 wrote:Yeah, how about put some pretty flowers in the big red cars instead of just grass and random signs.
wow pretty flowers, i thought you just got a gf.
But I do agree that the whole park needs better landscaping, well except carousel plaza that looks great.
lol and Plaza is a false indicator that this is how the whole park looks because I swear every queue line even Bull's needs some pruning. Cut back on the hanging baskets and take out the hedge clippers!