CoasterRiderSC wrote:Also I just had a thought: how reliable is that conveyor bin system? If it were to go down, does that shut the ride down??
I'm not sure how reliable it is at CanWon, but I've heard that the whole ride does go down if the conveyer goes down. I've spent a few days there and don't remember any downtime for Yukon
Sucker for a launch, custom audio and Demon | Coaster Count: 626
New permit (VC6H86) for Wrath that covers the site work, queue line, sound and lighting. Might be a good one to FOIA if you want to see the queue layout.
Wow, this pretty much confirms some sort of soundtrack or effects for the ride, unless "sound" is just talking about units for the spiels/station microphones.
Also, there was no commentary in this video, but a drone update posted from yesterday shows that track work is still not complete. It seems to be in the same place as Chicago Coaster Guy's last update. https://www.youtube.com/watch?v=LC58uKvaqlU
I wonder if we will see it complete this week? With opening day a month away, I would assume they need to get that end taken care of first in order to avoid the park becoming a giant horseshoe with no access point from SWT to County Fair. This is so exciting!
BCarroll wrote:Wow, this pretty much confirms some sort of soundtrack or effects for the ride, unless "sound" is just talking about units for the spiels/station microphones.
Also, there was no commentary in this video, but a drone update posted from yesterday shows that track work is still not complete. It seems to be in the same place as Chicago Coaster Guy's last update. https://www.youtube.com/watch?v=LC58uKvaqlU
I wonder if we will see it complete this week? With opening day a month away, I would assume they need to get that end taken care of first in order to avoid the park becoming a giant horseshoe with no access point from SWT to County Fair. This is so exciting!
2 months, it's not until May it will open
Old Great America was better, however I hope just a bit of that charm comes back
BCarroll wrote:Wow, this pretty much confirms some sort of soundtrack or effects for the ride, unless "sound" is just talking about units for the spiels/station microphones.
Also, there was no commentary in this video, but a drone update posted from yesterday shows that track work is still not complete. It seems to be in the same place as Chicago Coaster Guy's last update. https://www.youtube.com/watch?v=LC58uKvaqlU
I wonder if we will see it complete this week? With opening day a month away, I would assume they need to get that end taken care of first in order to avoid the park becoming a giant horseshoe with no access point from SWT to County Fair. This is so exciting!
2 months, it's not until May it will open
^ They mean that the park opens in a month
I’m assuming the sound is for speakers throughout the station and queue for announcements and spiels but that doesn’t mean we won’t see any theming sound effects at all. Can’t wait to see the queue take place!
There looks to be a bottleneck or two with some of the paths by Wrath. By the last few turns. I wonder if the park will make the path over there a bit wider?
Looks like today might be the day. The park posted the final track pieces are underway and the trains are being loaded onto the storage track! They posted two photos.
coasterfanatic wrote:Looks like today might be the day. The park posted the final track pieces are underway and the trains are being loaded onto the storage track! They posted two photos.
Sent from my iPhone using Tapatalk
Some time, on way to successful, first of steps of all of the steps to being successful steps are hardest of all of the steps to successing.
Video kept cutting out so I didn't see much else, but I would expect landscaping and infrastructure related construction around the midway to ramp up.
The only things I saw was a trench dug by demon Snacks and some roofing pieces being installed. That's either queue related or new foundations for the addition on that building.
Goku1910 wrote:Per Chicago Coaster Guy, the track work is done.
Video kept cutting out so I didn't see much else, but I would expect landscaping and infrastructure related construction around the midway to ramp up.
The only things I saw was a trench dug by demon Snacks and some roofing pieces being installed. That's either queue related or new foundations for the addition on that building.
Wasn’t planing on going live so I didn’t have the proper tools to do so so it was a bad feed but yes I can confirm the track is finished!!
briphotoguy wrote:Call me a skeptic…. But I see this opening BEFORE memorial day. Even a soft opening.
Sent from my iPhone using Tapatalk
I’d be surprised. X Flight was the last to open before Memorial Day and track was completed even earlier than Wrath.
Keep in mind that the park has to also focus on getting everything else ready. So maintenance has to get all the other trains up and ready in addition to Wrath…plus I imagine there won’t be a ton of construction going on when the park is open.