hotdog5113 wrote:I'm curious to watch the set up of the keyhole. Hopefully that will be visible on the webcam.
I would think that the track would go first, and this other part I would think would be 2 separate pieces that would fit after the track was put in.
"I've been staring at the world, waiting. All the trouble and all the pain we're facing. Too much light to be livin' in the dark. Why waste time? We only got one life. Together we can be the CHANGE. So go and let your heart burn bright"
You guys should be happy we have a webcam to watch and stop complaining about not seeing everything. Back when we were watching Bull and Superman go up there was no web cam and we relied on those driving by and taking pictures. Imagine if that was the case now with the ride being in the middle of everything and not on the edge of the park.
Aren't they able to just adjust the camera to the right a bit. Before, anybody could rotate the camera before SF locked it out from the public but the park can still pan it side to side.
Top 3 Steel Coasters: 1. The Incredible Hulk 2. Maverick 3. Dragon Challenge (Fireball)
Top 3 Wood Coasters: 1. The Beast 2. American Eagle (Red) 3. Hades
hotdog5113 wrote:When do you all think the track will be completed by? My guess is somewhere in early March, depending on the weather.
Barring a blizzard or whatnot, the track should be done before the end of the month. All the tricky stuff is laid out everything is mostly plug and play. Brakes chains and electric will take awhile.
If they let you choose which side you can go to the first year, I'm definitely choosing the left. The reason why I say "let you choose" is because I wouldn't be surprised to see them equally distribute the two sides to keep the queue balanced the first year. Such as let 16 people go to one side and 16 go to the other so everything flows smoothly once the line splits. They can do that simply with a clicker.
I realize the ride is always going to be packed and once the queue splits, both sides will be jammed. I just wonder if to keep the station organized at first they may try something like this. Just a thought.
Top 3 Steel Coasters: 1. The Incredible Hulk 2. Maverick 3. Dragon Challenge (Fireball)
Top 3 Wood Coasters: 1. The Beast 2. American Eagle (Red) 3. Hades
They haven't done much within these past two days, but I'm confident that they'll have the track done by March. Hopefully they'll adjust the webcam at some point so we can view the rest of the ride's construction.
Has anyone else noticed that the building that was saved from GAR looks like its in the spot were the hangar it dives through is going to be? Look at the layout and in comparison to the station it seems to be right here.....just a thought. What do you guys think?